Warkworth bus loop service Warkworth bus loop service
Bus route 999 will run one way around Warkworth every 30 minutes, enhancing local access to public transport.
Project status: Construction
Project zone: North
On this page
Project overview
Auckland Transport, in partnership with the Rodney Local Board, is implementing a new a one-way bus service. The new bus route, 999, will run one way around Warkworth in a clockwise direction approximately every 30 minutes.
Route 999 will enhance access to public transport for local commuters along Percy Street, Lilburn Street, Pulham Road, Woodcocks Road, Mansel Drive and Hill Street. These bus stops aim to provide residents with convenient access to the bus route, improving public transport connectivity within the community and safety for buses, bus users, pedestrians and other road users.
To allow buses to pull into and out of the proposed bus stops safely, some parking will be removed as part of this proposal. We understand that the removal of parking can be inconvenient, so we’ve minimised it as much as possible.
Project details
This project includes the installation of 6 new bus stops along the new route. The locations of these bus stops are:
1. 21 Percy Street (outside medical centres)
Install new bus stop with road marking and signage
2. 25 Lilburn Street
- Install new bus stop with road marking and signage
- Replace existing footpath with wider, extended concrete hardstand (concrete pad)
- Replace drop kerb with new kerbing in line with TDM standards
3. Opposite 7 Pulham Road
Install new bus stop with road marking and signage
4. 15 Woodcocks Road (outside Mahurangi College)
Install new bus stop with road marking and signage
5. Opposite 20 Mansel Drive (outside Summerset Falls Retirement Village)
- Install new bus stop with road marking and signage
- Install new hardstand (concrete pad)
- Install yellow tactile pavers to help guide blind and low-vision users
6. 62 Hill Street
- Install new bus stop with road marking and signage
- Install concrete hardstand (concrete pad) in line with TDM standards
Download project drawings (PDF 8.6MB)
What happens next
We will begin installing bus stop road markings and signage from 1 July 2024. We expect the work at each location to be completed by 21 July 2024.
Contact us
If you have enquiries or concerns about bus stop installation or construction, please contact the project team on the details below:
- Email: Projects@at.govt.nz
- Phone: 09 930 5090
If you have enquiries or concerns about the bus service, please contact AT.